Monitoring Substations - Ongoing or Periodic?

  • 02 November 2020

  • Neil Davies

High Voltage

The use of instruments to detect and measure Partial Discharge (PD) activity is well established as a way to identify substation assets which are in danger of failing. But which makes the better business case – ongoing PD monitoring or periodic PD surveys?

Image

Downloads

Please download our Monitoring Substations article