Advancements in Online PD Testing

Online, non-invasive PD testing now covers assets from 3kV to 500kV and beyond. A look at the latest techniques and what they reveal about asset health.
Two workers in safety gear standing at a high-voltage transformer station.

For decades it has been recognized that partial discharge assessment is an excellent method for determining asset health.

  • On line non-invasive techniques for monitoring and surveying have  been proven to provide the necessary level of detail for condition  assessment without impacting system operation.

  • Techniques exist now to test assets from 3KV to 500KV and beyond.  Metal clad switchgear and busswork, GIS switchgear and busses, air insulated assets (insulators, arrestors, bushings, etc.), as well as  paper insulated and extruded cables can all be tested on-line without  an outage.

This presentation will give a brief overview of the causes and effects of partial discharge and then examine the various technologies available  for finding it on-line.

Free Guide
The growing gap between energy awareness and demand

The whitepaper explores the growing gap between consumers’ efforts to reduce energy use and rising electricity demand, highlighting why smarter, more visible and flexible LV networks are essential as EVs, heat pumps and distributed energy resources accelerate electrification.

Download here
Consumer Energy Trends Whitepaper
Consumer Energy Trends whitepaper cover

Recent case studies

See how our solutions are empowering teams and transforming their networks to unlock capacity, prevent outages and direct investment.