Offline cable PD testing needs long outages and heavy kit. This paper explains how non-invasive online testing finds partial discharge without either.
A speaker presenting at a conference panel on non-invasive testing methods for cables.

Partial Discharge is a not well understood phenomenon that can cause catastrophic failure of electrical assets.  It can exist at initial commissioning or occur only after decades of use.  Testing cables for partial discharge in the field can be divided into online and offline.  Traditionally offline methods require long outages, invasive techniques, and large, expensive test equipment, all of which limit its usefulness as a condition monitoring method.

Online cable partial discharge testing and monitoring has been increasingly deployed over the past 10 years.  This paper highlights the basics of online partial discharge testing in cables and covers the non-invasive online techniques available today.  Both periodic surveying and full- time monitoring are covered.  Case studies of successful detection of partial discharge in cables are presented.

Free Guide
The growing gap between energy awareness and demand

The whitepaper explores the growing gap between consumers’ efforts to reduce energy use and rising electricity demand, highlighting why smarter, more visible and flexible LV networks are essential as EVs, heat pumps and distributed energy resources accelerate electrification.

Download here
Consumer Energy Trends Whitepaper
Consumer Energy Trends whitepaper cover

Recent case studies

See how our solutions are empowering teams and transforming their networks to unlock capacity, prevent outages and direct investment.