Contact

Rotating Machine Condition Assessment

Assess motor and generator insulation to identify failure risks, reduce downtime and extend reliable service life.

You may unsubscribe from our updates anytime. To learn how we manage and protect your personal information, head to our Privacy Policy.

Trusted by network operators and infrastructure providers globally

Test insulation before it becomes a failure

Our engineers use offline insulation diagnostic tests to assess motors and generators. Testing can identify stator and rotor winding defects, moisture and contamination, loose connections, inter-turn faults and weak insulation. Results support fault diagnosis, maintenance planning and decisions about repair or replacement.

Contact us โ†’
Supporting power networks across critical infrastructure

We build the technology that keeps electrical networks visible, predictable and safe for the industries that can't afford to lose power.

Network Owners and Operators

As low-carbon technologies become mainstream, network operators face rising demand and growing complexity while being asked to improve reliability. Proactive solutions, workforce efficiency and intelligent investment are central to meeting those challenges.

Renewables

Successful, profitable operation of onshore and offshore wind and solar sites requires a smart approach to asset management. Minimizing downtime and improving safety require proactive solutions that keep sites reliable as assets scale and operational complexity increases.

Data Centers

Protecting uptime and system resilience is critical for data centers, and with 60% of downtime causes being power related, identifying and addressing hidden electrical risks early ensures redundancy remains untested.

Water utilities and wastewater

Pollution incidents caused by electrical issues make up almost half of all reports, with even minor power disturbances at risk of escalating if not detected and managed.

Real world impact

Comprehensive offline testing of motors and generators to identify insulation defects early, reduce unplanned downtime and extend reliable service life.

60 years
of electrical expertise
20,000+
PD test records in our reference database
85%
of switchgear failures are related to partial discharge