How to Perform a PD Survey | EA Technology Australia
+61 (0) 7 3256 0534

Timelapse: How to perform a PD survey


  • 24 May 2023

  • EA Technology

Videos

Featuring the UltraTEV® Plus², watch our quick timelapse to find out how our Head of Technical Services, Brad Monaghan, conducts a PD survey.

Basic steps mentioned in the video:

  1. TEV Testing
  2. Ultrasonic Testing with airborne probe
  3. Ultrasonic Testing with contact probe
  4. Repeat at the rear and top of the HV switchboard
  5. Recorded PD data can now be analysed offsite
Image
Brad Monaghan
Head of Technical Services