Proactive PD Survey Helps Prevent Future High-Voltage Asset Failures
- 
                
                
04 August 2025
 - 
                
                
EA Technology
 
Case Studies - HV 
    The project demonstrates the value of early diagnostics and expert intervention at high-profile, mission-critical locations. By identifying developing issues and environmental risks, EA Technology supported the prevention of failure, enhanced operational resilience, and laid the groundwork for long-term condition monitoring.
Read our full case study in the downloads section.